Skip to main content

Lumetra lifecycle

Keep the work connected from request to release.

Lumetra structures each stage of the assessment lifecycle while preserving ownership, evidence, review and professional accountability.

The eight stages

  1. 01Request and intake
  2. 02Project and scope
  3. 03Field evidence
  4. 04Structured findings
  5. 05Analysis and planning
  6. 06Professional review
  7. 07Report and release
  8. 08Portfolio learning

01

Request and intake

Purpose
Establish why the work is needed and who is involved.
Key record
Intake request with contact, driver and initial scope.
Professional control
Authorized requester and contractual terms are confirmed.
Stage 01 — Request and intakeFictional demonstration data
Illustrative interface concept for the request and intake stage of one fictional assessment project.

02

Project and scope

Purpose
Define buildings, systems, criteria, inclusions and outputs.
Key record
Approved scope document and project structure.
Professional control
Scope is agreed before field work begins.
Stage 02 — Project and scopeFictional demonstration data
Illustrative interface concept for the project and scope stage of one fictional assessment project.

03

Field evidence

Purpose
Capture observations in the context where they belong.
Key record
Observation with location, component, media and author.
Professional control
Field personnel follow the approved method and templates.
Stage 03 — Field evidenceFictional demonstration data
Illustrative interface concept for the field evidence stage of one fictional assessment project.

04

Structured findings

Purpose
Connect evidence to condition, deficiency, priority and recommendations.
Key record
Authored finding linked to supporting evidence.
Professional control
Findings are traceable to observations and prior records.
Stage 04 — Structured findingsFictional demonstration data
Illustrative interface concept for the structured findings stage of one fictional assessment project.

05

Analysis and planning

Purpose
Develop costs, timing, scenarios or technical interpretation appropriate to the workflow.
Key record
Analysis record with assumptions and methods.
Professional control
Technical interpretation is performed by qualified personnel.
Stage 05 — Analysis and planningFictional demonstration data
Illustrative interface concept for the analysis and planning stage of one fictional assessment project.

06

Professional review

Purpose
Validate completeness, reasoning, evidence and presentation.
Key record
Review record with comments, revisions and approval.
Professional control
Reviewer is authorized and independent where required.
Stage 06 — Professional reviewFictional demonstration data
Illustrative interface concept for the professional review stage of one fictional assessment project.

07

Report and release

Purpose
Assemble, approve, issue and present controlled outputs.
Key record
Issued report and approved structured record.
Professional control
Release is approved through the controlled workflow.
Stage 07 — Report and releaseFictional demonstration data
Illustrative interface concept for the report and release stage of one fictional assessment project.

08

Portfolio learning

Purpose
Retain governed records for history, benchmarking and future planning.
Key record
Governed portfolio history with retention and access rules.
Professional control
Access and retention follow organizational policy.
Stage 08 — Portfolio learningFictional demonstration data
Illustrative interface concept for the portfolio learning stage of one fictional assessment project.

Your workflow is the starting point.

A Lumetra walkthrough should follow the stages, roles and deliverables your team actually manages — not a generic feature tour.