Structured project context
Keep requests, buildings, systems, scope and required outputs in one project record.
The Orbis Structus platform
Lumetra connects structured scope, field evidence, findings, professional review, reporting, controlled delivery and capital planning within a traceable project record.
Capabilities
Keep requests, buildings, systems, scope and required outputs in one project record.
Connect observations, photographs, notes, markups and approved measurements to the relevant location or component.
Link condition, deficiency, priority, recommendation and planning information back to supporting records.
Record ownership, revision, questions and approval before information is released.
Assemble approved records into module-specific reports and client-facing information.
Preserve governed project and portfolio history for future assessments, planning and benchmarking.
Lifecycle
Each stage has a purpose, a key record and a professional-control point.
Request and intake
Project and scope
Field evidence
Structured findings
Analysis and planning
Professional review
Report and release
Portfolio learning
Module portfolio
Connect scope, hierarchy, evidence, findings, QA, reporting, delivery and capital-planning logic.
Extend Lumetra with enclosure-specific assemblies, evidence, defect taxonomy, technical review and reporting.
Intended to connect approved condition, timing and cost assumptions to long-term planning scenarios.
Intended to support traceable evidence chains and structured expert-review pathways for forensic investigations.
Intended to link building performance data to condition records for retrofit and decarbonization planning.
Intended to apply Lumetra structure to commissioning evidence, issue tracking and closeout records.
Intended to carry approved findings into scoped remediation work with tracked status and approvals.
Experiences
Lumetra is designed for the people doing the work and the people receiving it.
Governance
Maturity labels reflect development intent, not a product release schedule.
Illustrative interface concept
Six concept moments from scope to released output. These are illustrative interface concepts built on fictional demonstration data, not screenshots of a live product.
Building systems
6 in scope
Required outputs
Report, tables, plan
Discolouration and cracking at Level 3. Evidence linked to location, component and prior repair history.
Recommendation
Confirm extent against adjacent panels.
Reviewer note
Extent confirmed against adjacent panels. Approved for release.
Building Condition Assessment
Prepared for Riverside Portfolio
Finding 3.2 — Cladding distress
Approved by the authorized reviewer
Building Condition Assessment — 2026
12
Findings
3
Priority items
We will walk through your current workflow and show where Lumetra's structure fits.