Building hierarchy
Buildings, systems and components are organized so every later observation and finding can be traced back to the place it belongs.
Lumetra for Building Condition Assessment
Lumetra structures the Building Condition Assessment lifecycle so project teams can develop reviewed records and client outputs without separating the evidence from the decision trail.
Scope and hierarchy
Projects start with buildings, systems, components, scope inclusions and required outputs configured to the engagement.
Buildings, systems and components are organized so every later observation and finding can be traced back to the place it belongs.
Use an ASTM/Uniformat-informed structure where reviewed and configured for the engagement. Taxonomies, rating scales and required fields are set before capture starts, not reconstructed during reporting.
Field evidence
Each observation is connected to a location, component, photograph, note, author and status so evidence stays in context.
Photographs, markups and notes are attached to the observation record and referenced from the related finding.
Every observation carries author, timestamp and status so the field record can be reviewed against the approved method.
Draft, complete, flagged and confirmed states help teams see what still needs attention before findings are written.
Findings
Findings carry condition, deficiency, priority, recommendation, timing and cost fields with visible authorship.
Condition rating, deficiency description, priority, recommendation, timing and cost assumptions are stored as structured data so reports can be assembled consistently.
Each finding shows the author who created it and the reviewer who approved it, with revision history preserved for later review.
Review and QA
Review is recorded as assignment, questions, revision and approval states before any information is released.
Review tasks are assigned with scope and criteria so reviewers know what to validate.
Reviewers can raise questions, request revisions and track responses before approving a record for release.
Working drafts remain separate from released outputs. Release is a deliberate workflow step, not a default state.
Report and delivery
Reports are composed from approved findings and records, then issued through a controlled release step.
Lumetra helps teams produce consistent report sections, tables and client-facing summaries from the same governed record. It does not claim automatic completeness: the quality of the output depends on the quality of the approved inputs and the review performed by the responsible team.
Capital planning
When a workflow supports it, approved findings can feed timing, cost and scenario assumptions for capital planning.
BCA findings can carry cost and timing assumptions that inform planning conversations. The goal is to preserve the link between the original evidence, the finding and the planning assumption so the decision trail remains intact.
A separate Reserve Fund / Capital Planning module remains On the roadmap. It is intended to connect approved condition, timing and cost assumptions to long-term planning scenarios.
Implementation
Building Condition Assessment is supported by two Orbis Structus service programs.
Configure Lumetra around your BCA method, templates and review workflow. Deployment is shaped to your existing process, not a forced replacement of it.
Explore DeployStructure building data, taxonomies and portfolio context so Lumetra has a reliable foundation for hierarchy, comparison and reporting.
Explore AtlasProduct demonstration
Six moments from scope to released output. Every frame is fictional demonstration data.
Building systems
6 in scope
Required outputs
Report, tables, plan
Discolouration and cracking at Level 3. Evidence linked to location, component and prior repair history.
Recommendation
Confirm extent against adjacent panels.
Reviewer note
Extent confirmed against adjacent panels. Approved for release.
Building Condition Assessment
Prepared for Riverside Portfolio
Finding 3.2 — Cladding distress
Approved by the authorized reviewer
Building Condition Assessment — 2026
12
Findings
3
Priority items
Approved findings feed forward into multi-year cost and timing scenarios for planning conversations.
We will map your stages, roles and deliverables to Lumetra's structure and identify where the evidence trail can be strengthened.